检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王亚辉 王维 WANG Yahui;WANG Wei(Power China Zhongnan Engineering Corporation Limited,Changsha 410014,China)
机构地区:[1]中国电建集团中南勘测设计研究院有限公司,湖南长沙410014
出 处:《电工技术》2022年第21期57-60,共4页Electric Engineering
摘 要:针对江苏淮安某风电项目已有钢混塔架基础改建为锚栓连接的纯钢塔基础设计方案,对新加混凝土与已有基础的传力性能采用精细化实体有限元模型分析受力特点,并通过分析极端运行工况和正常运行工况下的基础应变、裂缝宽度和钢筋应力验证设计的安全性,结果表明提出的设计变更方案安全可靠,便于实施,满足国内相关标准规范要求,为实际工程的正常施工及运行稳定提供了保障。Aiming at the design scheme of rebuilding the existing steel-concrete tower foundation of a wind power project in Huaian,Jiangsu into a pure steel tower foundation connected by anchor bolts,the force transmission performance of the newly added concrete and the existing foundation was analyzed by using a refined solid finite element model to analyze its force characteristics.The safety of design is verified by analyzing the foundation strain,crack width and reinforcement stress under extreme operating conditions and normal operating conditions.The results show that the proposed design change scheme is safe and reliable,easy to implement,meets the requirements of relevant domestic standards and specifications,and provides guarantee for normal construction and operation stability of actual projects.
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49