煤矿坑道钻机后部加卸钻杆装置设计  

Design of Loading and Unloading Drill Pipe Device at Back of Coal Mine Tunnel Drilling Rig

在线阅读下载全文

作  者:刘智 Liu Zhi(Xi’an Research Institute,China Coal Technology and Engineering Group,Xi’an 710077,China)

机构地区:[1]中煤科工集团西安研究院有限公司,西安710077

出  处:《煤矿机械》2022年第10期119-121,共3页Coal Mine Machinery

基  金:“十三五”国家科技重大专项资助项目(2016ZX05045-003)。

摘  要:根据长钻杆体积大、重量重、钻进过程中使用数量多等特点,研制了煤矿坑道钻机自动加卸长钻杆装置。介绍了长钻杆加卸装置的方案制定,叙述了上卸扣装置、托举装置的设计过程,并简述了上杆过程和卸杆过程。现场工业性试验过程中,长钻杆加卸装置累计上卸钻杆4 340根,动作稳定,性能可靠,满足了煤矿坑道钻机加卸长钻杆的使用需求。According to the characteristics of large volume,heavy weight and large number of long drill pipes used in the drilling process,an automatic loading and unloading long drill pipe device for coal mine tunnel drilling rig was developed.Introduced the scheme formulation of long drill pipe loading and unloading device,described the design process of make up and unloading device and lifting device,and briefly described the process of loading and unloading rod.During the industrial test,4 340drill pipes were loaded and unloaded by the long drill pipe loading and unloading device,with stable action and reliable performance,which meets the application requirements of loading and unloading long drill pipes for coal mine tunnel drilling rig.

关 键 词:长钻杆 加卸装置 上卸扣装置 托举装置 吊运装置 

分 类 号:TD421[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象