检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杜畅 刘喜元 张健[1] 汪宝罗 陈旭云 俞晓东[1] DU Chang;LIU Xiyuan;ZHANG Jian;Wang Baoluo;CHEN Xuyun;YU Xiaodong(College of Water Resources and Hydropower,Hohai University,Nanjing,Jiangsu 210098,China;Management Service Center of Hangjiahu South Drainage Project,Jiaxing,Zhejiang 314000,China;Zhejiang Provincial Water Conservancy and Hydropower Survey and Design Institute,Hangzhou,Zhejiang 310002,China)
机构地区:[1]河海大学水利水电学院,江苏南京210098 [2]嘉兴市杭嘉湖南排工程管理服务中心,浙江嘉兴314000 [3]浙江省水利水电勘测设计院,浙江杭州310002
出 处:《排灌机械工程学报》2022年第12期1248-1253,1267,共7页Journal of Drainage and Irrigation Machinery Engineering
基 金:国家重点研发计划项目(2016YFC0401810);江苏省第五期“333工程”科研项目(BRA2018061)。
摘 要:针对泵后管线先降后升的长距离大流量输水系统,当水泵发生抽水断电时泵后管线高点处易出现负压的特点,提出了一种调压塔联合末端调流阀的停泵水锤防护方案,并基于瞬变流计算的特征线法建立了全系统水力过渡过程的数学模型,模拟了系统停泵水锤全过程.结合某实际输水工程,探究常规调压塔防护方案的调压塔最小面积,给出泵后设调压塔结合末端调流阀联动关闭的水锤防护方案的参数选取原则,对比常规调压塔防护方案与泵后设调压塔结合末端调流阀联动关闭的水锤防护方案对停泵水锤的影响.计算结果表明,常规调压塔防护方案调压塔面积达到1100 m^(2),投资成本巨大;调压塔结合末端调流阀联动关闭的防护方案末端调流阀关闭过快会引起管道正压过大,关闭过慢会导致管道水流回流能力不足,选取合适的末端调流阀关闭时间,在满足系统水锤防护标准的前提下,可以有效地减小调压塔面积.The long-distance water transmission system after the pump is prone to negative pressure when the pump is deenergized.A pump-stop water hammer protection scheme of pressure regulating tower combined with end regulator valve was proposed,and a mathematical model of the hydraulic transition process was established based on the characteristic line method of transient flow calculation to simulate the whole process of pump-stopping water hammer.Combined with the actual project,the minimum area of the pressure regulating tower of the conventional pressure regulating tower protection scheme was explored,and the parameter selection principle of the water hammer protection scheme of the pressure regulating tower set after the pump combined with the end regulator valve linkage was gi-ven,and the influence of the water hammer protection scheme of the conventional scheme and the water hammer protection scheme of the pressure regulating tower set behind the pump combined with the end regulator valve linkage closure on the water hammer of the pump was stopped.The results show that the area of the conventional scheme voltage regulating tower is 1100 m^(2).The protection scheme of the pressure regulating tower combined with the linkage closing of the end regulator valve will cause the pipeline positive pressure to be too large,while it closes slowly to lead to insufficient water flow return capacity of the pipeline.By selecting the appropriate end regulator closing time,under the premise of meeting the system water hammer protection standards,the area of the pressure regulating tower can be effectively reduced.
关 键 词:长距离供水工程 水锤 联合防护 大流量 调压塔 调流阀
分 类 号:S277.7[农业科学—农业水土工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.163.51