检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李万海 李建军 耿瑜平 LI Wanhai;LI Jianjun;GENG Yuping(Yellow River Engineering Consulting Co.,Ltd.)
机构地区:[1]黄河勘测规划设计研究院有限公司,河南郑州450003
出 处:《大坝与安全》2022年第5期45-51,61,共8页Dam & Safety
摘 要:高土石坝初蓄期对库水位抬升速率有严格的限制。通过对某砾石土心墙堆石坝初蓄期库水位变化与坝体变形的分析研究,发现库水位抬升速率过快易导致坝体产生较大变形,严重时可能对坝体防渗结构产生破坏。因此,心墙土石坝在初蓄期严格控制库水位抬升过程,加强坝体变形监测对确保大坝的安全具有重要意义。There is a strict restriction on the rising rate of reservoir level during the initial impoundment period of high earth-rock dams.Through analysis and research on the change of reservoir level and the dam deformation during the initial impoundment period,it is found that high rising rate of reservoir level is prone to cause large deformation,and in serious cases,it may damage the seepage prevention structure.Therefore,it is of significance to strictly control the rising process of reservoir level and strengthen the dam deformation monitoring in the initial impoundment period to ensure the dam safety.
分 类 号:TV698[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49