检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡红钱[1] 叶军[1] 薛明瑞[1] Hu Hongqian;Ye Jun;Xue Mingrui(Zhejiang Industry Polytechnic College,Zhejiang 312000)
出 处:《船电技术》2022年第12期30-33,共4页Marine Electric & Electronic Engineering
基 金:浙江省教育厅一般科研项目(Y202146575)。
摘 要:配置大功率负载是航母等现代大型舰船的需要。大功率负载设备受工况和海况的多重影响,频繁的工作极易产生大幅功率波动,对包括电压、电流、频率等电网安全稳定造成影响和冲击。基于综合电力系统构建“船舶电站-逆变器-推进电机-螺旋桨”的完整电能链,根据大功率负载的工作情况,对大功率负载投入时电网的电压、电流、转速和扭矩等关键指标进行理论分析、计算和仿真,获得完备数据以保障中压供电大负荷船舶综合电力系统的有效运行。It is a necessary demand for modern large-scale ships such as aircraft carriers to configure high-power loads.High power load equipment is subject to multiple affects of working conditions and sea conditions,and continual work is prone to generate large power fluctuations,which will affect the safety and stability of power grid including voltage,current and frequency.Based on the integrated power system,a complete power chain of"ship power station-inverter propulsion motor-propeller"is constructed.According to the working conditions of high-power loads,critical parameters such as voltage,current,velocity and torque of the power grid are theoretically analyzed,calculated and simulated when high-power loads are put into operation,and complete data is obtained to ensure the effective operation of medium voltage power supply and high-load ship integrated power system.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.22.242.110