检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:熊炜[1] 李荣果[1] 周怀道 XIONG Wei;LI Rongguo;ZHOU Huaidao(Sinohydro Bureau 7 Co.,Ltd.,Chengdu Sichuan 610213)
机构地区:[1]中国水利水电第七工程局有限公司,四川成都610213
出 处:《四川水力发电》2022年第6期56-59,共4页Sichuan Hydropower
摘 要:通过总结叶巴滩水电站大坝左右岸缆机平台以上边坡、缆机平台至坝顶边坡锚喷支护的施工经验,介绍了锚杆注浆采用二次清空、先注浆后插杆工艺等细节控制措施,与传统锚杆注浆质量优良率相比,无论在质量控制方面,还是施工进度方面新方法都表现出更大的优势。以细节控制措施在高品质锚杆注浆优良率中的应用为例,介绍了Ⅰ类锚杆比例提升的科技创新和实际应用过程。By summarizing the construction experience of bolt and shotcrete support on the slope above the cable crane platform on the left and right banks of the dam of Yebatan Hydropower Project and the slope from the cable crane platform to the dam crest,the bolt grouting adopts the detailed control measures such as secondary emptying,grouting first and the inserting rod technology.Compared with the excellence rate of the traditional bolt grouting quality,the new method shows greater advantages in both quality control and construction progress.Taking the excellent rate of detail control in high-quality bolt grouting as an example,this paper introduces the scientific and technological innovation and practical application of increasing the proportion of class Ⅰ bolt.
关 键 词:类锚杆 细节控制 注浆质量优良率 叶巴滩水电站 研究
分 类 号:TV7[水利工程—水利水电工程] TV52TV543TV546
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28