作 者:吴利国 王军红 WU Liguo;WANG Junhong(Sinohydro Bureau 7 Co.,Ltd.,Chengdu Sichuan 610213)
机构地区:[1]中国水利水电第七工程局有限公司,四川成都610213
出 处:《四川水力发电》2022年第6期64-67,共4页Sichuan Hydropower
摘 要:固增水电站建设采用的是以施工方牵头的EPC总承包模式,在其实施阶段,充分发挥了施工方的优势。本文阐述了针对特长引水隧洞薄壁混凝土施工采取的解决策略,充分发挥了总承包模式的组织管理优势,优化了施工工艺与配合比,统一协调资源管理、争优提效,在保证质量安全的前提下加快了施工进度,最终实现了节点目标,所取得的经验可供类似工程参考。Guzeng Hydropower Project was constructed by applying the EPC general contracting mode leaded by construction enterprise.In the construction period,the advantages of the construction enterprise are brought into full play.This paper expounds the solutions for the construction of the thin-wall concrete of the extra-long diversion tunnel.Under the general contracting model,the advantages of organization and management were fully played,the construction process and mix ratio were optimized the construction technology and the mix ratio,the resource management was coordinated and efficiency was improved.The construction progress was accelerated in the condition of quality and safety,and the node goal was finally realized.The experience obtained can be used as reference for similar projects.
关 键 词:遇水膨胀止水条 连仓浇筑 高流态混凝土 辅着式振捣器 跳仓浇筑 固增水电站 薄壁混凝土衬砌
分 类 号:TV7[水利工程—水利水电工程] TV52TV554
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31