跨海桥梁大节段钢箱梁安装调位精度控制研究  被引量:3

Research on Precision Control of Position Adjustment of Large Section Steel Box Girder for Sea-crossing Bridges

在线阅读下载全文

作  者:徐彦东 方超 XU Yan-dong;FANG Chao(CCCC First Harbour Engineering Company Ltd.,Tianjin 300000,China)

机构地区:[1]中交第一航务工程局有限公司,天津市300000

出  处:《公路》2022年第11期202-207,共6页Highway

摘  要:随着桥梁建设的发展,钢箱梁以其跨度大、自重轻、承载能力强,以及可后场预制拼装、现场安装节约工期的优点,广泛应用于跨海桥梁施工。以厦门第二东通道工程东侧非通航孔桥钢箱梁安装为例,对安装调位过程中的精度控制进行深入研究,具有为后续类似工程提供借鉴的意义。With the development of bridge construction, steel box girder is widely used in the construction of sea-crossing bridges due to its advantages of large span, light weight, as well as strong bearing capacity, and can be prefabricated and assembled on site to save construction time. Taking the erection and installation of the steel box girder of the channel bridge of Xiamen Second East Passageway Project as an example, the precision control in the process of installation and adjustment is studied in depth, which provides reference for subsequent similar projects.

关 键 词:桥梁工程 钢箱梁施工 限位 千斤顶 温度 

分 类 号:U448.213[建筑科学—桥梁与隧道工程] U445.46[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象