检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高峰 陈宝华 赵伟鹏 GAO Feng;CHEN Bao-hua;ZHAO Wei-peng(Coal Science(Cangzhou Bohai New District)Coal Detection Co.,Ltd.,Cangzhou,Hebei 061110,China)
机构地区:[1]煤科(沧州渤海新区)煤炭检测有限公司,河北沧州061110
出 处:《煤炭加工与综合利用》2022年第12期77-81,共5页Coal Processing & Comprehensive Utilization
摘 要:在采用库仑滴定法测定工作中,实验发现,当库仑测硫仪停止实验后,在一段时间间隔内再次做实验,实验的测值偏差较大,同时发现库仑测硫仪的电解池有无深色玻璃罩也会对测值变化产生一定影响。为提高库仑测硫仪停止实验后再次测定全硫数据的准确性,对停止实验后的时间间隔以及电解池有无深色玻璃罩对再次测值的影响进行了实验分析,取得了较好的实践效果。When the Coulomb sulfur meter is used for experiments,it will be found that after the equipment is stopped for a period of time,the measured data is sometimes normal and sometimes low,even lower than the standard value of certified coal reference materials,which exceeds the uncertainty range.It is also found that the dark glass cover or not in the electrolytic cell of Coulomb sulfur meter will also have a certain influence on the change of measured value.According to this phenomenon,the influence of the time after stopping the experiment and whether there is a dark glass cover in the electrolytic cell on the measured value is analyzed experimentally.
分 类 号:TQ533.1[化学工程—煤化学工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.224.199.201