钢结构桥梁安装顶推工艺施工探讨  

Discussion on the Construction of Steel Structure Bridge Installation Jacking Technology

在线阅读下载全文

作  者:梅鸿飞 MEI Hongfei(China Railway Chang'an Heavy Industry Co.,Ltd.,Xi'an 710032,China)

机构地区:[1]中铁长安重工有限公司,陕西西安710032

出  处:《河南科技》2022年第24期65-68,共4页Henan Science and Technology

摘  要:钢结构桥梁顶推施工过程中,对主桥各个构件进行应力监控显得非常重要。在桥梁工程顶推施工过程中,导梁是一个非常重要的辅助结构。应用了顶推法的施工原理和施工方法。以实际工程为例,对模拟顶推过程进行分析,探讨钢结构桥梁大跨度顶推施工技术,介绍顶推施工法的工作原理,具体研究钢结构桥梁超重柔性钢梁大跨度顶推施工的施工工艺、施工准备、技术要点和施工过程控制要点。In the process of steel structure bridge jacking construction, it is very important to monitor the stress of each component of the main bridge. Guide beam is a very important auxiliary structure in bridge jacking construction. The construction principle and method of pushing method are applied. In practical engineering, for example, to analyze simulation pusher, explore, large span steel bridge jacking construction technology, this study introduces the working principle of jacking construction method, concrete research of steel bridge overweight flexible large span girder construction technology of jacking construction technology, construction preparation, main technical points and construction process control points.

关 键 词:钢结构桥梁 顶推工艺 施工探讨 

分 类 号:U445.58[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象