检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘星 杨俊 邹金标 LIU Xing;YANG Jun;ZOU Jinbiao(Shanghai Construction No.5(Group)Co.,Ltd.,Shanghai 200063,China)
出 处:《建筑施工》2022年第11期2656-2658,共3页Building Construction
摘 要:针对项目难特点,运用质量管理理论和统计方法,开展创新课题研究,通过系列改进和优化,研发出一套超长混凝土结构施工模架装备,并应用于工程实践,最终确保完成了超长水池墙体高精度施工模架装备达到毫米级要求、水池墙面平整度验收合格、工期提前三大项目目标。In view of the difficult characteristics of the project,the quality management theory and statistical methods were used to carry out innovative research projects.Through a series of improvements and optimization,a set of super long concrete structure construction formwork equipment was developed and applied to engineering practice,finally,the three main project objectives of super long pool wall high-precision construction formwork equipment meeting the millimeter level requirements,the pool wall flatness accepted and the construction period ahead of schedule are ensured.
关 键 词:质量管理理论 超长墙体 高精度施工模架装备 毫米级要求
分 类 号:TU731[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42