检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李蕾 LI Lei(Nanjing Xuolian Construction Labor Service Co.,Ltd.,Nanjing,Jiangsu210031,China)
机构地区:[1]南京加索联建筑劳务有限公司,江苏南京210031
出 处:《建筑施工》2022年第11期2770-2772,共3页Building Construction
摘 要:高层建筑在狭小的城市街道或密集建筑群中施工建设较为常见,这给垂直度控制测量造成了不少困难。以某高层建筑的施工案例为背景,总结了全站仪后方交会测量方案在高层建筑施工的垂直度控制过程中的应用技术,为同类工程施工测量提供了一定的借鉴。High-rise buildings are commonly constructed in narrow urban streets or amongst dense buildings,which causes many difficulties in verticality control measurement.Taking the construction case of a high-rise building as the background,this paper summarizes the application technology of total station rear intersection measurement scheme in the verticality control process of high-rise building construction,which provides a certain reference for the construction measurement of similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200