检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孔秋平 KONG Qiuping(Geotechnical and Environmental Enterprise Engineering Technology Research Center of Fujian province,Longyan 364000;Fujian YonKing Geotechnical Co.,Ltd,Longyan 364000)
机构地区:[1]福建省岩土与环境企业工程技术研究中心,福建龙岩364000 [2]福建永强岩土股份有限公司,福建龙岩364000
出 处:《福建建筑》2022年第11期69-71,77,共4页Fujian Architecture & Construction
摘 要:基坑止水帷幕是基坑工程重要环节之一,其安全、稳定性直接影响基坑及周边的安全。在实际基坑工程中,往往因为地质条件、设计方案等因素,导致止水帷幕的失效,进而影响整个工程的安全及工期。结合实际工程,探讨在严重不均匀块石填土下卧基岩地质中,如何采用长螺旋潜孔钻机引孔结合局部黏土置换方法,以及运用双重高压旋喷桩止水帷幕,确保止水效果。The water stop curtain of the foundation pit is one of the important links of the foundation pit project, and its safety and stability directly affect the safety of the foundation pit and its surrounding areas. In the actual foundation pit engineering, the failure of the water stop curtain is often caused by geological conditions, design schemes and other factors, thus affecting the safety and duration of the entire project. Combined with the actual project, this paper discusses how to use the method of long spiral down the hole drilling machine combined with local clay replacement, and how to use the double high-pressure jet grouting pile water stop curtain to ensure the water stop effect in the bedrock geology under the seriously uneven block rock fill.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.149.120