检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张峰华 蔡春辉 徐扬[1] 刘积成 王琼 ZHANG Fenghua;CAI Chunhui;XU Yang;LIU Jicheng;WANG Qiong(East China Architectural Design and Research Institute Co.,Ltd.,Shanghai 200002,China)
机构地区:[1]华东建筑设计研究院有限公司,上海200002
出 处:《给水排水》2022年第11期81-86,共6页Water & Wastewater Engineering
摘 要:上海自从2022年3月初开始发现新冠肺炎疫情本土病例以来,本土新增病例人数急剧增长,现有集中隔离场所严重不足,尽快开展临时集中隔离场所的建设工作就非常重要。结合对既有建筑原为大空间厂房的改造,分析设计中的重点难点,并对设计及施工过程中不足之处进行归纳分析,以便为后续项目提供参考。With local Coronavirus Omicron cases discovered in early March 2022, the number of new local cases has skyrocketed, which caused the existing centralized quarantine places in serious short supply and constructing the temporary ones immediately is so important. During the retrofitting process of an existing large-space factory to a temporary centralized quarantine place, the challenges in the design of water supply and drainage have been presented in this paper, as well as the analysis of the difficulties in the construction process to provide the guideline for future projects in this field.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.239