巴基斯坦滨佳胜三期联合循环电站项目集控楼暖通空调系统设计  被引量:2

HVAC System Design of Central Control Building of Pakistan BQPS Ⅲ Combined Cycle Power Plant Project

在线阅读下载全文

作  者:王天伦 寇希望 Wang Tianlun;Kou Xiwang(Harbin Electric International Co.,Ltd.,Harbin 150028,China;Northeast Electric Power Design Institute Co.,Ltd.of China Power Engineering Consulting Group,Changchun 130021,China)

机构地区:[1]哈尔滨电气国际工程有限责任公司,黑龙江哈尔滨150028 [2]中国电力工程顾问集团东北电力设计院有限公司,吉林长春130021

出  处:《科学技术创新》2022年第36期63-66,共4页Scientific and Technological Innovation

摘  要:针对巴基斯坦滨佳胜三期900 MW联合循环电站项目,集控楼各个房间不同暖通要求,并考虑巴基斯坦国的气候类型,对比中国规范标准,确定了集控楼的暖空调系统的设计原则和设计方案,得到业主的确认和批准。为以后执行巴基斯坦国其他电厂的集控楼暖通系统设计提供借鉴。Considering the different HVAC requirements of different rooms in the central control building of Pakistan BQPS Ⅲ 900 MW Combined Cycle Power Plant Project and the climate type of Pakistan,compared with Chinese standards to determine the design principles and design schemes of the HVAC system in the central control building, which have been confirmed and approved by the owner. It will provide reference for the future implementation of HVAC system design of central control building of other power plants in Pakistan.

关 键 词:联合循环电站 集控楼 暖通空调 系统设计 

分 类 号:TU831.3[建筑科学—供热、供燃气、通风及空调工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象