重水堆电厂控制系统设备分级管理实践与探索  

Practice and Exploration of Equipment Classification Management in CANDU6 NPP

在线阅读下载全文

作  者:沈艳 Shen Yan(CNNC Nuclear Power Operations Management Co.,Ltd.,Engineering Department 3,Zhejiang,Jiaxing,314300,China)

机构地区:[1]中核核电运行管理有限公司技术三处,浙江嘉兴314300

出  处:《仪器仪表用户》2023年第1期70-75,共6页Instrumentation

摘  要:基于AP913设备可靠性管理体系和重水堆电厂设备分级的管理实践,结合数字化、智慧化电厂的管理理念,提炼出了贴合重水堆电厂实际的设备分级管理模式。该模式采用了设备分级电子化流程,并总结出了以结果为导向的“八步分析法”,做到了设备分级闭环管理,完善了对设备分级的管控,提升了设备分级的正确性和设备的可靠性。最后结合应用经验,提出了进一步优化方案。Based on AP913 equipment reliability management system and the management practice in CANDU6 NPP, combined with the management concept of digital and intelligent power plant, extracted up the actual CANDU6 NPP equipment classification management mode. This model adopts electronic equipment classification process, and summarizes the results-oriented "Eight-step Analysis",so as to achieve closed-loop management of equipment classification, improves the management and control of equipment classification and the accuracy and reliability of equipment classification. Finally a further optimization scheme is proposed based on the application experience.

关 键 词:设备分级 八步分析法 电子化 设备可靠性 重水堆 

分 类 号:TM623[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象