检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘速 Liu Su(CCCC Third Harbor Consultants Co.,Ltd.,Shanghai 200032,China)
机构地区:[1]中交第三航务工程勘察设计院有限公司,上海200032
出 处:《港工技术》2022年第6期29-33,共5页Port Engineering Technology
摘 要:在海边、河边等建设项目,其护岸工程是防护项目场地上的设备、建筑物等安全的重要结构工程。结合某油品码头后方护岸加固修复工程设计,针对淤泥层较厚、波浪条件差及原结构多样等难点,本文通过分析提出统筹设计的思路,并运用价值工程中的强制确定法比选方案。实践表明,统筹设计思路结合强制确定法所采用的斜坡式抛石加固修复方案不仅经济而且较成功地解决了工程中所面临的技术难点,对类似工程具有一定的借鉴和参考。As for the projects at the seaside or riverside,the revetment is an important structure that shields equipment and buildings on site.Based on the design of reinforced revetment in rear of an oil product quay,to solve the difficulties such as thicker silt layer,poor wave conditions and diversity in original structures,the idea of overall design is put forward through analysis,and the options are compared and selected by using enforced determination method in value engineering.The practice shows that the inclined riprap reinforcing plan based on overall design idea combined with enforced determination method is economical,successful in solving the technical difficulties,and instructional to similar projects.
分 类 号:TV222[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.239.11