检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Hongjun Gao Wang Ma Yingmeng Xiang Zao Tang Xiandong Xu Hongjin Pan Fan Zhang Junyong Liu
机构地区:[1]College of Electrical Engineering,Sichuan University,Chengdu 610065,China [2]Iowa State University,Ames,lowa,50010,USA [3]Key Laboratory of Smart Gridof Ministry of Education,Tianjin University,Tianjin 300072,China
出 处:《Journal of Modern Power Systems and Clean Energy》2022年第5期1241-1255,共15页现代电力系统与清洁能源学报(英文)
基 金:supported by the National Key R&D Program of China (No.2019YFE0123600);National Natural Science Foundation of China (No.52077146);Young Elite Scientists Sponsorship Program by CSEE (No.CESS-YESS-2019027)。
摘 要:The increasing integration of photovoltaic generators(PVGs) and the uneven economic development in different regions may cause the unbalanced spatial-temporal distribution of load demands in an urban distribution network(UDN). This may lead to undesired consequences, including PVG curtailment, load shedding, and equipment inefficiency, etc. Global dynamic reconfiguration provides a promising method to solve those challenges. However, the power flow transfer capabilities for different kinds of switches are diverse, and the willingness of distribution system operators(DSOs) to select them is also different. In this paper, we formulate a multi-objective dynamic reconfiguration optimization model suitable for multi-level switching modes to minimize the operation cost, load imbalance, and the PVG curtailment. The multi-level switching includes feeder-level switching, transformer-level switching, and substation-level switching. A novel load balancing index is devised to quantify the global load balancing degree at different levels. Then, a stochastic programming model based on selected scenarios is established to address the uncertainties of PVGs and loads. Afterward, the fuzzy c-means(FCMs) clustering is applied to divide the time periods of reconfiguration. Furthermore, the modified binary particle swarm optimization(BPSO)and Cplex solver are combined to solve the proposed mixed-integer second-order cone programming(MISOCP) model. Numerical results based on the 148-node and 297-node systems are obtained to validate the effectiveness of the proposed method.
关 键 词:Binary particle swarm optimization(BPSO) dynamic reconfiguration multi-level switching mixed-integer second-order cone programming(MISOCP) urban distribution network(UDN)
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170