检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Ye Niu ZeQun Hong Jun Zhang Lei Han
机构地区:[1]China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan,Hubei,430056,China [2]School of Mechanics and Civil Engineering,China University of Mining and Technology,Xuzhou,Jiangsu,221116,China [3]CCCC Second Highway Consultants Co.,Ltd.,Wuhan,Hubei,430056,China [4]Department of Geotechnical Engineering,Tongji University,Shanghai,200092,China
出 处:《Research in Cold and Arid Regions》2022年第4期267-273,共7页寒旱区科学(英文版)
基 金:This research was supported by the National Natural Science Foundation of China(No.52108386)。
摘 要:The Freeze-Sealing Pipe-Roof(FSPR)method,which has been applied for the first time in the Gongbei Tunnel of the Hong Kong-Zhuhai-Macao Bridge,is a new approach of tunnel pre-support that allows flexible adjustment of freeze tube arrangement and can be adapted to different environmental conditions.When the FSPR method is used to construct shallow burial submerged tunnels,the frozen wall to hold back groundwater during excavation will be weakened by air and water flows inside and outside the tunnel,and its waterproof performance needs to be further investigated.In this paper,a two-dimensional numerical model of the temperature field considering excavation and moving water boundary is established based on the preliminary design scheme and in-situ conditions and is used to analyze the variation in frozen curtain properties with various active freezing times during excavation.The results show that excavation has a weakening effect on both sides of the frozen wall,with a greater effect on the inner side,and a positive temperature appears in the local area inside the jacked pipe.The concrete fill in the jacked pipe obviously improves the freezing efficiency,and the tunnel excavation after 60 days of active freezing in the interval filling mode can ensure that the frozen soil thickness at the thinnest segment exceeds 2 m,i.e.,the design requirement.In practice,the active freezing time can be extended appropriately to reduce the influence of river water flow above the tunnel.The study serves as a technical reference for the design and implementation of similar projects.
关 键 词:Freeze-sealing pipe-roof method Submerged tunnel Soil excavation Temperature field Frozen wall thickness
分 类 号:U455.49[建筑科学—桥梁与隧道工程]