检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张睿哲 周恺 赵留学[2] 谭磊[2] 李鸿达 王雅妮 蔡瀛淼 李春生 陈帅 ZHANG Rui-zhe;ZHOU Kai;ZHAO Liu-xue;TAN Lei;LI Hong-da;WANG Ya-ni;CAI Ying-miao;LI Chun-sheng;CHEN Shuai(Electric Power Research Institute,State Grid Beijing Electric Power Company,Beijing 100072,China;State Grid Beijing Electric Power Company,Beijing 100075,China;Beijing Deep Blue Space Remote Sensing Technology Co.,Ltd.,Beijing 100028,China)
机构地区:[1]国网北京市电力公司电力科学研究院,北京100072 [2]国网北京市电力公司,北京100075 [3]北京深蓝空间遥感技术有限公司,北京100028
出 处:《科学技术与工程》2022年第33期14744-14751,共8页Science Technology and Engineering
基 金:国家电网有限公司科技项目(52020118000U)。
摘 要:实现输电线路覆冰预测是保障北京地区输电线路在覆冰季正常运行的关键技术。针对北京地区输电线路覆冰预测技术研究,采用皮尔逊相关系数和灰色系统关联度分析方法,利用历史数据研究覆冰厚度与微气象微地形的相关性,得出湿度、坡向、风向和高程对覆冰厚度影响程度较高;通过多种环境特征要素组合构建基于极限随机树模型和灰色系统预测模型的覆冰预测模型,对比不同模型的预测结果的均方根误差(root mean square error,RMSE),得出由湿度和风向组合构建的灰色系统覆冰预测模型效果最佳。研究结果表明,与同类预测方法相比考虑了微地形对覆冰厚度预测的影响,得到北京地区输电线路覆冰厚度相关性较高的环境因素为湿度、坡向、风向和高程;对比多种环境要素构建的覆冰预测模型,湿度和风向组合的灰色系统预测模型的均方根误差明显优于其他组合,可以有效实现北京地区输电线路覆冰预测。Prediction of transmission line icing is a key technology to ensure the normal operation of transmission lines in Beijing during the icing season.Aiming at Beijing area,Pearson correlation coefficient and grey system correlation degree analysis method were used to study the correlation between ice cover thickness and micrometeorological and microtopography based on historical data,and the results show that humidity,slope direction,wind direction and elevation had a higher degree of influence on ice cover thickness.The ice cover prediction model based on the extremely randomized trees model and the grey system prediction model was built by combining various environmental characteristics.The root mean square error(RMSE)of the prediction results of different models was compared,and the grey system prediction model based on the combination of humidity and wind direction was the best.The results show that,compared with the similar prediction methods,the influence of micro-topography on icing thickness prediction is considered,and the environmental factors with high correlation of icing thickness of transmission lines in Beijing are humidity,aspect,wind direction and elevation.Compared with the icing prediction models constructed by various environmental factors,the root mean square error of the grey system prediction model combining humidity and wind direction is significantly better than other combinations,which can effectively realize the icing prediction of transmission lines in Beijing.
关 键 词:输电线路 覆冰 微气象 微地形 相关性分析 极限随机树预测模型 灰色系统预测模型
分 类 号:TM751[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.115.168