出  处:《船电技术》2023年第1期16-19,共4页Marine Electric & Electronic Engineering

摘  要:针对海工电力电缆截面选择缺乏完整选择要素的问题,提出了初步选择电缆后逐步验证的方法。该方法先通过敷设系数、环境温度、额定电流和开关允通等因素初步选择电缆截面,然后验证在此截面下的电缆是否满足末端短路和动静态压降的要求,如不满足,逐步加大电缆截面直到满足要求。本文通过案例表明缺乏完整的电缆截面选择要素会导致电缆截面选择不足。For solving the problem that the cross-section selection of power cable for offshore unit is short of complete selection elements,a method of gradual verification after basic selection is put forward.In this method,the cable cross-section is preliminarily selected,based on laying coefficient,ambient temperature,rated current and let through.And then the cable is verified to meet the requirements of end of line fault and dynamic and static voltage drop.If not,the cable cross-section will be gradually increased until the requirements are met.This paper shows that the lack of complete cable cross-section selection elements will lead to insufficient selection of cable cross-section.

关 键 词:电力系统 电缆截面选择 海工 

分 类 号:U665.12[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象