检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭峥 金明珠 李飞 PENG Zheng;JIN Ming-zhu;LI Fei(China Xixing Construction Engineering Co.,Ltd.,100009,Beijing,China)
机构地区:[1]中国新兴建筑工程有限责任公司,北京100009
出 处:《建筑技术》2022年第12期1714-1716,共3页Architecture Technology
摘 要:预制管桩作为一种新型的桩基础具有工程造价便宜、桩身内空、强度高、混凝土用量少,节约资源、便于施工等优点,如何做好预制管桩灌注封堵成为了运用管桩施工的质量重点。嘉祥县人民医院新院区项目在预制管桩灌注封堵施工前,对桩头管芯技术进行了研究与讨论,创新了桩头封堵新技术,为类似工程提供了参考。As a new type of pile foundation, prefabricated pipe piles have the advantages of low engineering cost, hollow inside the pile body, high strength, less concrete consumption, resource saving,and easy construction. The first quality threshold for the construction of various projects using pipe piles.Before the construction of prefabricated pipe piles, Jiaxiangxian People’s Hospital explored and discussed the technology of the pile head and pipe core, and innovated the new technology of pile head plugging.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43