检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:尤捷 YOU Jie(Jiangsu Zhongtai Jianfa Group Co.,Ltd.,Taizhou 225300,China)
机构地区:[1]江苏中泰建发集团有限公司,江苏泰州225300
出 处:《广东水利水电》2023年第1期103-105,110,共4页Guangdong Water Resources and Hydropower
基 金:国家自然科学基金(编号:41471040);南京水利科学研究院水利部水科学与水工程重点实验室开放研究基金(编号:Yk914006)。
摘 要:由于周山河航道为重要的内河通道,为缓解因长江口门通行能力不足引起的船舶通行压力,减少长江口门待闸船舶因滞留而带来的安全隐患和带动沿途经济。需对周山河船闸上游的内河航道进行治理,该文以此为工程案例进行分析。以混凝土铰链排铺设及其铺设技术为重点作阐述,最后对混凝土铰链排铺设施工质量控制进行总结,可为类似工程提供借鉴。As Zhoushan river channel is an important inland channel, it is designed to alleviate the traffic pressure of ships caused by the insufficient traffic capacity of the Yangtze Estuary and reduce the potential safety hazards caused by the detention of ships waiting to be locked at the Yangtze Estuary and drive the economy along the way. It is necessary to harness the inland waterway upstream of Zhoushan River lock. This paper takes this as an engineering case for analysis. This paper focuses on the concrete hinge row laying and phase laying technology, and finally summarizes the construction quality control of concrete hinge row laying. Hope to provide reference for future related work.
分 类 号:TV85[水利工程—水利水电工程] TV861
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15