检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴建军 李志乾 李涛 刘思源 WU Jian-jun;LI Zhi-qian;LI Tao;LIU Si-yuan(Yellow River Engineering Consulting Co.,Ltd.,Zhengzhou 450003,China)
机构地区:[1]黄河勘测规划设计研究院有限公司,河南郑州450003
出 处:《云南水力发电》2022年第12期122-125,共4页Yunnan Water Power
摘 要:辛克雷水电站沉砂池位于IX度地震区,基础为深度大于80m的砂砾石覆盖层,基础处理是制约沉砂池布置及安全的关键问题。通过多种基础处理方案的研究,确定采用灌注桩复合基础,较好地解决了基础沉降和高地震水平荷载对桩身的影响,为高地震区、深厚覆盖层处理积累了工程经验。The sinking basin of CCS Hydropower Station is located in the IX seismic area, and its foundation is a sand and gravel covering layer with a depth greater than 80m. Foundation treatment is a key problem to restrict the layout and safety of grit chamber. Through the study of various foundation treatment schemes, it is decided to adopt composite foundation of cast-in-place piles. It preferably solves the influence of foundation settlement and high seismic horizontal load on pile body, and accumulates engineering experience for treatment of high seismic area and deep overburden.
关 键 词:辛克雷水电站 沉砂池 高地震区 深厚覆盖层 基础处理
分 类 号:TV222[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.215.45