检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王超[1] 孔令仲 朱双 陈广明 陈曦 孙嘉辉 雷晓辉[1] WANG Chao;KONG Lingzhong;ZHU Shuang;CHEN Guangming;CHEN Xi;SUN Jiahui;LEI Xiaohui(China Institute of Water Resources and Hydropower Research,Beijing 100038,China;College of Hydraulic Science and Engineering,Yangzhou University,Yangzhou 225009,China;School of Geography and Information Engineering,China University of Geosciences,Wuhan 430074,China;Anhui Provincial Group Limited for Yangtze-to-Huaihe Water Diversion,Hefei 230601,China;School of Civil and Hydraulic Engineering,Shandong University,Jinan 250061,China)
机构地区:[1]中国水利水电科学研究院,北京100038 [2]扬州大学水利科学与工程学院,江苏扬州225009 [3]中国地质大学地理与信息工程学院,武汉430074 [4]安徽省引江济淮集团有限公司,合肥230601 [5]山东大学土建与水利学院,济南250061
出 处:《南水北调与水利科技(中英文)》2022年第6期1109-1116,共8页South-to-North Water Transfers and Water Science & Technology
基 金:国家自然科学基金项目(51779268);中国科协青年人才托举工程项目(2019QNRC001);引江济淮工程(安徽段)综合调度方式研究(YJJH-ZT-ZX-20190718170)。
摘 要:为挖掘引江济淮工程沿线湖泊调蓄能力在保障供水、降低泵站输水能耗方面的潜力,开展考虑湖泊调蓄的跨流域调水工程旬水量调度研究,构建考虑湖泊调蓄的泵站-湖泊多目标旬水量优化调度模型,并采用遗传算法进行求解,以制定满足用水单元缺水量最少、泵站能耗最小和湖泊不平衡量最小的泵站-湖泊联合调度方案。分析引江济淮工程调度运行的不同典型运行工况,以自流引江工况为例讨论考虑湖泊调蓄的旬水量调度方案的优势。结果表明,考虑湖泊调蓄的调度方案能有效提高供水保证率、降低泵站总输水能耗,可为引江济淮工程运行调度提供决策支撑。The Yangtze-to-Huaihe River Water Transfer Project is a large-scale inter-basin water transfer project which combines a series of gate pump engineering entities and lakes with storage capacity. Water regulation is an important work to guide the operation of project scheduling, which can be divided into annual water regulation,monthly water regulation, and ten-day scale water regulation, according to the scheduling period and time scale. Tenday scale water regulation determines the daily water transmission and supply process of the water transfer project in the next ten-day period and reduces the operation cost of the water transfer project while meeting the water supply demand. The ten-day scale water regulation is guided by the total ten-day water transfer determined by monthly water regulation, and at the same time provides total daily water transfer for the real-time operation of the pumping station project, which is the key link between water operation scheduling and real-time scheduling of water transfer project. In recent years, a large number of studies have reported the optimal scheduling calculation method of the cascade pumping station system in the water transfer project, but there are few studies on the joint scheduling of the water transfer project and the complex water conveyance system of gate pump lake mixing, especially the optimal scheduling considering the lake regulation-control process. Facing the actual engineering requirements of the Yangtze-to-Huaihe River Water Transfer Project, it is urgent to further study the influence of the lake regulationcontrol process on the optimal operation mode of cascade pumping stations based on existing research.A study on ten-day scale water volume regulation of inter-basin water transfer project considering the lake storage regulation process was carried out to exploit the potentialities of ensuring water supply and reducing the energy consumption of pumping stations through the regulation and control capacity of the lakes in the project. A multi-objective
关 键 词:引江济淮工程 湖泊调蓄 泵站输水能耗 跨流域调水工程 旬水量调度
分 类 号:TV213[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145