检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:龚泽佳 鱼志鸿 章定文[1,3] 冯硕 李兆国 GONG Zejia;YU Zhihong;ZHANG Dingwen;FENG Shuo;LI Zhaoguo(School of Transportation,Southeast University,Nanjing 211189,Jiangsu,China;China Construction Eighth Engineering Division Rail Transit Construction Co.,Ltd.,Nanjing 210046,Jiangsu,China;National Demonstration Center for Experimental Road and Traffic Engineering Education,Southeast University,Nanjing 211189,Jiangsu,China)
机构地区:[1]东南大学交通学院,江苏南京211189 [2]中建八局轨道交通建设有限公司,江苏南京210046 [3]东南大学道路交通工程国家级实验教学示范中心,江苏南京211189
出 处:《建筑科学与工程学报》2023年第1期133-141,共9页Journal of Architecture and Civil Engineering
基 金:国家自然科学基金项目(52078129)。
摘 要:盾构机在复合地层掘进过程中常因刀具磨损量过大而产生掘进工效降低和刀具失效等问题。依托深圳地铁13号线白应区间复合地层段滚刀磨损数据,根据Rabinowicz磨粒磨损计算模型提出了一种滚刀磨损量实用预测方法。该方法结合滑移率计算公式和刀盘扭矩、刀盘推力得到滚刀滑动距离,通过科罗拉多矿业学院模型(CSM模型)、岩石强度参数和滚刀贯入深度确定接触面法向荷载,根据滚刀设计参数确定其材料强度。通过确定影响滚刀磨损量的三个主要因素(滑动距离、接触面法向荷载和材料强度),推导出了考虑盾构滚刀磨损体积计算公式,并采用深圳地铁13号线白应区间复合地层段滚刀实测磨损量与磨损量预测值进行对比验证。结果表明:实测磨损量与预测较为吻合,验证了所提出的滚刀磨损量预测方法的合理性,研究成果可为复合地层中盾构滚刀磨损量预测和换刀时机的确定提供理论依据。In the process of shield tunneling in complex formation,shield machine often has problems such as reduced tunneling efficiency and tool failure due to excessive tool wear.Based on the disc cutter wear data of Baiying section of Shenzhen Metro Line 13,a practical prediction method of disc cutter wear was proposed according to Rabinowicz abrasive wear calculation model.The method combined the slip rate calculation formula,the cutter head torque and cutter head thrust to obtain the sliding distance of the disc cutter.The normal load of contact surface was determined by combining the Colorado School of Mining Model(CSM Model),rock strength parameters and the penetration depth of the disc cutter,and the material strength was determined according to the design parameters of the disc cutter.By determining three main factors(sliding distance,normal load of contact surface and material strength)affecting disc cutter wear,the calculation formula of disc cutter wear volume considering shield machine was derived,and the measured wear volume of disc cutter and the predicted wear volume of disc cutter in composite stratum section of Baiying section of Shenzhen Metro Line 13 were compared and verified.The results show that the measured wear volume is in good agreement with the prediction values,which verifies the rationality of the proposed prediction method of cutter wear volume.The research results can provide a theoretical basis for the prediction of cutter wear volume and the determination of cutter change time in composite strata.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222