覆岩及地下水联合作用下煤矿地下水库人工坝体稳定性研究  被引量:2

Study on Stability of Artificial Dam of Underground Reservoir in Coal Mine under Coupling Action of Overburden Rock and Hydraulic Power

在线阅读下载全文

作  者:虎晓龙 宋丹青 刘晓丽[2] 甄维鹏 宋喜东 武书泉 HU Xiao-long;SONG Dan-qing;LIU Xiao-li;ZHEN Wei-peng;SONG Xi-dong;WU Shu-quan(Lingxin Coal Mine,CHN Energy Ningxia Coal Industry Co.,Ltd.,751410,Lingwu,Ningxia,China;State Key Laboratory of Hydroscience and Hydropower Engineering,Tsinghua University,100084,Beijing,China;Planning and Development Department,CHN Energy Ningxia Coal Industry Co.,Ltd.,750001,Yinchuan,Ningxia,China)

机构地区:[1]国家能源集团宁夏煤业有限责任公司灵新煤矿,宁夏灵武市751410 [2]清华大学水沙科学与水利水电工程国家重点实验室,北京市海淀区100084 [3]国家能源集团宁夏煤业有限责任公司规划发展部,宁夏银川市750001

出  处:《河北水利电力学院学报》2022年第4期1-7,共7页Journal of Hebei University Of Water Resources And Electric Engineering

基  金:宁夏回族自治区重点研发计划项目(2018BCG01003);国家自然科学基金面上项目(52079068)。

摘  要:地下水库是解决我国水资源短缺的重要工程措施之一,利用煤矿采空区建设矿井地下水库对实现矿井采空区地下空间及矿井水资源化、能源化利用,促进矿区环境生态保护意义重大。以宁夏灵新煤矿为例,采用有限元方法建立三维数值模型,研究上覆岩体及设计水头荷载作用下煤矿地下水库人工坝体力学变形特性。研究表明:地下水库人工坝体及围岩的变形主要集中于迎水侧的拱形砌碹支架前段底板区域,挡水坝体变形集中在其中部区域,坝体的最大位移小于1 mm;坝体的最大应力集中于砌碹支架顶板处,挡水坝体的最大应力集中在其外侧区域,围岩的最大应力集中在其与砌碹支架交界处,坝体的最大应力小于3.325 MPa;坝体的最大等效塑性应变分布于迎水侧砌碹支架与挡水坝体交界区域,数值计算及安全系数分析表明,倒锥形坝体的结构稳定性良好,满足地下水库建设和运营的目的。Underground reservoir is one of the important engineering measures to solve water resource shortage in China.The construction of underground reservoir in mine goaf is of great significance to realize underground space in mine goaf and utilization of mine water resources and energy resources,and promote environmental and ecological protection in mine area.Taking Lingxin Coal mine in Ningxia as an example,a three-dimensional numerical model was established by using finite element method to study mechanical deformation characteristics of artificial dam body of underground reservoir in coal mine under overlying rock mass and design head load.The results show that the deformation of the artificial dam and surrounding rock of the underground reservoir is mainly concentrated in the front section of arch crown support and the bottom floor area of the upstream side,and the deformation of the retaining wall is concentrated in the middle area,and the maximum displacement of the dam is less than 1mm.The maximum stress of the dam is concentrated at the crown of the arch walling support,the maximum stress of the retaining wall is concentrated at the outside of the arch walling support,the maximum stress of the surrounding rock is concentrated at its junction with the arch walling support,and the maximum stress of the dam is less than 3.325 MPa.The maximum equivalent plastic strain of the dam body is located at the junction between arch walling and retaining wall on the upstream side.Numerical calculation and safety factor analysis show that the dam body has good structural stability and meets the purpose of underground reservoir construction and operation.

关 键 词:煤矿 地下水库 覆岩 设计水头荷载 稳定性 

分 类 号:TV62[水利工程—水利水电工程] TD325[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象