检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴剑[1] 方元昌 郭清江 WU Jian;FANG Yuanchang;GUO Qingjiang(China Telecom Quanzhou Branch,Quanzhou 362000,China;China Telecom Fujian Company,Fuzhou 350000,China;China Tongfu Fujian Design Institute,Fuzhou 350000,China)
机构地区:[1]中国电信泉州分公司,福建泉州362000 [2]中国电信福建公司,福建福州350000 [3]中国通服福建设计院,福建福州350000
出 处:《通信电源技术》2022年第20期83-88,共6页Telecom Power Technology
摘 要:传统电信综合机房因早期历史因素限制,规划机柜的热密度不高,随着设备的更新换代,出现局部高热密度机柜的需求,导致为满足供冷需求,机房消耗大量资源。目前,选择与服务器机柜相匹配的背板式热管空调,能够有效地解决该问题,探讨利用机房空调的机房潜冷量的再回收,从而优化机房背板热管空调的使用。Traditional telecommunications integrated server room due to early historical factors,the planning of the thermal density of the cabinets is not high,with the renewal of equipment,there is a local demand for high thermal density cabinets,resulting in a large amount of resources consumed by the server room to meet the demand for cooling.At present,the choice of backplane heat pipe air conditioners matched with server cabinets is a more effective solution to the problem,and will explore the use of server room air conditioners for the re-recovery of latent cooling in the server room,thus optimizing the use of server room backplane heat pipe air conditioners.
分 类 号:TP308[自动化与计算机技术—计算机系统结构]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.190.158.12