检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨柳 黄云超 YANG Liu;HUANG Yunchao(North China University of Water Resources and Electric Power,Zhengzhou 450046,Henan,China)
机构地区:[1]华北水利水电大学水利学院,河南郑州450046
出 处:《黄河水利职业技术学院学报》2023年第1期19-24,共6页Journal of Yellow River Conservancy Technical Institute
基 金:国家青年基金:深覆盖层高面板堆石坝长周期地震动响应特征及破坏机制研究(52009045)。
摘 要:当地震灾害发生后,需尽快开展震损水库除险加固工作,以避免发生次生灾害。基于改进的熵权法确定震损水库评估指标权重,结合逼近理想解排序法与灰色关联分析法,构建灰色理想值逼近模型,评价水库综合价值测度和除险加固顺序,并采用改进灰色聚类方法对比验证该模型的准确性。When the earthquake disaster occurs,it is necessary to carry out the earthquake-damaged reservoir reinforcement work as soon as possible to avoid secondary disasters.Based on the improved entropy weight method to determine the evaluation index weight of earthquake-damaged reservoir,combined with the approximation ideal solution ranking method and grey correlation analysis method,the grey ideal value approximation model was constructed.The comprehensive value of reservoir and the reinforcement sequence were evaluated.The improved grey clustering method was used to compare and verify the accuracy of the model.
关 键 词:震损水库 熵权法 TOPSIS 灰色关联分析法 加固顺序 指标体系 对比验证
分 类 号:TV621[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28