作 者:陈创 CHEN Chuang(China Energy Engineering Group Guangxi Electric Power Design Institute Co.,Ltd.,Nanning 530007,China)
机构地区:[1]中国能源建设集团广西电力设计研究院有限公司,广西南宁530007
出 处:《红水河》2022年第6期27-32,共6页Hongshui River
摘 要:大化水电站开关站迁移改造后,原有继电保护配置方案的外部条件改变,处于规范要求的边缘,存在不满足技术要求的可能性。为了适应该项目的建设,笔者对原方案是否满足技术要求和新方案的适用性进行了分析,通过详细计算,综合考虑项目建设的因素,从技术经济方面对2个继电保护配置方案进行比较,得出原方案可以满足技术要求,该项目可以维持采用原方案的结论。After the migration and transformation of the switch station of Dahua Hydropower Station, the external conditions of the original relay protection configuration scheme change, which is on the edge of the specification requirements, and there is a possibility that it does not meet the technical requirements. In order to adapt to the construction of the project, the author analyzes whether the original scheme meets the technical requirements and the applicability of the new scheme. Through detailed calculation, considering the factors of project construction, the two relay protection configuration schemes are compared from the technical and economic aspects. It is concluded that the original scheme can meet the technical requirements and the project can maintain the original scheme.
分 类 号:TV733[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.209.49