检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈高昂 王松 杨飞 喻致蓉 Chen Gao'ang;Wang Song;Yang Fei;Yu Zhirong(Pingdingshan PMJ Coal Mine Machinery Equipment Co.,Ltd.,Pingdingshan 467000,China)
机构地区:[1]平顶山平煤机煤矿机械装备有限公司,河南平顶山467000
出 处:《煤矿机械》2022年第12期17-19,共3页Coal Mine Machinery
摘 要:以某隧道二衬模板台车的模板表面清理与自动涂装脱模剂一体化系统为例,介绍了现有隧道施工中台车模板表面固化水泥清理和脱模剂涂刷工序存在的问题,并对现有技术条件下的解决方案进行了对比分析,进一步阐述了解决问题思路,并提出新的优化设计方案。工程实践表明,该台车模板自动清理与涂膜一体化系统在提高清理固化水泥和涂脱模剂工序方面的施工效率和保证混凝土衬砌质量方面效果明显。Taking the integrated system of formwork surface cleaning and automatic coating release agent of a tunnel second lining formwork trolley as an example, introduced the problems existing in the surface curing cement cleaning of trolley formwork and the brushing process of release agent in the existing tunnel construction, compared and analyzed the solutions under the existing technical conditions,further expounded the ideas to solve the problems, and put forward a new optimization design scheme.The engineering practice shows that the integrated system of automatic cleaning and coating of trolley formwork has obvious effect in improving the construction efficiency of cleaning and curing cement and coating release agent and ensuring the quality of concrete lining.
关 键 词:隧道衬砌台车 二衬台车 自动清理 隧道衬砌 清理与涂膜一体化
分 类 号:U455.3[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.180.66