中国先进研究堆安全棒驱动系统故障测试分析  

Failure Test Analysis of Safety Rod Drive System of China Advanced Research Reactor

在线阅读下载全文

作  者:罗忠[1] 王玉林[1] 朱吉印[1] 甄建霄 朱学微 LUO Zhong;WANG Yu-lin;ZHU Ji-yin;ZHEN Jian-xiao;ZHU Xue-wei(China Institute of Atomic Energy,P.O.Box 275-43,Beijing 102413,China;China Institute of Nuclear Industry Strategy,Beijing 100037,China)

机构地区:[1]中国原子能科学研究院反应堆工程技术研究部,北京102413 [2]中核战略规划研究总院规划所,北京100037

出  处:《核电子学与探测技术》2022年第2期350-354,共5页Nuclear Electronics & Detection Technology

摘  要:针对CARR安全棒驱动系统在调试和试运行阶段出现的问题,对CARR安全棒驱动系统进行了测试研究,掌握了CARR安全棒驱动系统的运行特性,发现了CARR安全棒提棒时间随着提棒次数的增加呈周期性变化的现象,基于此现象,提出了由提棒时间的变化来判断驱动线磨损情况以及监测驱动回路内部阻力变化的新方法,对CARR安全棒驱动系统在今后运行中可能出现的问题,提出了运行维护建议.In view of the problems of the CARR safety rod drive system during the commissioning and trial operation phases,the CARR safety rod drive system was tested and studied,and the operating characteristics of the CARR safety rod drive system were mastered.It is found that the lifting time of CARR safety rod changes periodically with the increase of lifting times.Based on this phenomenon,a new method to judge the wear of the drive line and monitor the change of internal resistance of the drive circuit by the change of rod lifting time is proposed.The operation and maintenance suggestions are put forward for the possible problems of CARR safety rod drive system in the future operation.

关 键 词:中国先进研究堆 安全棒驱动系统 试验研究 

分 类 号:TL375.5[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象