检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘立强 LIU Liqiang(Yalong River Hydropower Development Co.,Ltd.)
机构地区:[1]雅砻江流域水电开发有限公司,四川成都610051
出 处:《大坝与安全》2022年第6期73-77,80,共6页Dam & Safety
摘 要:为解决复杂地质条件下坝基开挖保护与处理问题,创新采用“小药量多分区弱刻槽开挖”的断层蚀变岩体开挖与回填混凝土、加强固结灌浆处理关键技术,通过工程应用和现场声波检测等数据分析评价开挖和固结处理措施的效果,实现了防止坝基岩体开挖松弛和保证岩体稳定、确保不良坝基满足高拱坝建基要求、避免断层发育岩体整体破坏等目标,具有重要理论意义和广阔的应用前景。To solve the technical difficulties in excavation protection of dam foundation under complex geological conditions,technologies of excavating fault-altered rock mass-excavating weak grooves by a small amount of explosive charge each time and by multiple zones,backfilling with concrete,and consolidation grouting are innovatively adopted.The effects of excavation and consolidation treatment measures are evaluated by engineering application and on-site acoustic detection analysis to prevent relaxation of excavated dam foundation rock mass and to ensure rock mass stability.It can help ensure that the unfavorable dam foundation conditions can meet up with the requirements of a high arch dam foundation,and avoid the overall failure of rock mass due to fault conditions,which has important theoretical significance and broad application prospects.
分 类 号:TV52[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.169