检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙海良 张国川 王海涛 锁进杰 SUN Hailiang;ZHANG Guochuan;WANG Haitao;SUO Jinjie(Driving Office,Pingdingshan Tian'an Coal Industy Co.,Ltd.,Pingdingshan 467000,China;Henan Pingbao Coal Co.,Ltd.,Xuchang 461714,China;State Key Laboratory for the Coal Mine Disaster Dynamics and Control,Chongqing University,Chongqing 400044,China)
机构地区:[1]平顶山天安煤业股份有限公司开拓处,河南平顶山467000 [2]河南平宝煤业有限责任公司,河南许昌461714 [3]重庆大学煤矿灾害动力学与控制国家重点实验室,重庆400044
出 处:《煤炭技术》2022年第11期19-21,共3页Coal Technology
基 金:国家科技重大专项资助项目(2016ZX05045001)。
摘 要:为正确指导首山一矿己15-1712110工作面机巷受回采动压影响下的经济安全支护,利用3DEC离散元数值模拟软件,对工作面机巷在掘进以及回采过程中受到动压影响下的巷道围岩受力以及塑性区分布进行了数值模拟计算,并分析了巷道围岩变形破坏规律。研究结果表明,在巷道挖掘后,巷道围岩的受力状态发生改变,巷道两帮逐步形成应力集中,巷道围岩出现损伤。巷道开始回采后,动压影响开始显现,围岩的变形量和变形速率明显加快,且随工作面回采呈加速趋势。In order to correctly guide the economic and safe support of the machine lane of Shoushan No.1 Mine′sⅥ15-1712110 working face under the influence of dynamic pressure of back mining numerical simulation software of 3DEC discrete element was used to calculate the force and distribution of plastic zone of the surrounding rock of the working face machine lane under the influence o dynamic pressure in the process of excavation and back mining,and analyze the deformation and damage law of the surrounding rock of the lane.The research results show that after the excavation o the tunnel,the stress state of the tunnel surrounding rock is changed,and the stress concentration is formed gradually on both sides of the tunnel,and the tunnel surrounding rock is damaged.After the roadway began to be retrieved,the influence of dynamic pressure began to appear,and the deformation volume and deformation rate of the surrounding rock were obviously accelerated,and the trend was accelerated with the workface retrieval.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49