检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张淑红[1] 吴晋萍 张卫 ZHANG Shuhong;WU Jinping;ZHANG Wei(Qingdao Institute of Technology,Jiaozhou,Shandong 266300,China;State Grid Taiyuan Power Supply Company,Taiyuan,Shanxi 030012,China)
机构地区:[1]青岛工学院,山东胶州266300 [2]国网太原供电公司,山西太原030012
出 处:《山西电力》2022年第6期5-9,共5页Shanxi Electric Power
摘 要:介绍了电力市场化改革部分试点省区的经验和科研部门开发的新清算系统的结构特点,阐述了分时电价研究的进展,探讨了由执行分时电价转为进入电力市场的初期大用户可能遇到的问题,在持续负荷曲线洛桑德公式基础上,分析了电网企业代理购电与分时电价衔接的问题,实例计算表明了这种衔接的可能性与效果。The experience of electric power market reform of some pilot provinces and the structural characteristics of the new clearing system developed by scientific research departments are introduced,the research progress of time-of-use(TOU)price is expounded,and the possible problems that bulk users may encounter in the early stage when they switch from implementing TOU price to entering the electricity market are discussed. Based on Rossander formula of the load duration curve(LDC),the connection between power purchase agency and TOU price in power grid enterprises is analyzed. And practical calculation verifies the possibility and effect of this connection.
关 键 词:持续负荷曲线 洛桑德公式 分时电价 用户响应 合约电量
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.184.109