煤矿区煤层气“四区联动”井上下联合抽采模式与技术体系  被引量:18

Mechanism and technical system of ground and underground combined drainage of CBM in “four region linkage” in coal mining area

在线阅读下载全文

作  者:李国富 张遂安[3] 季长江 李军军[1,2] 王朝帅 LI Guofu;ZHANG Suian;JI Changjiang;LI Junjun;WANG Chaoshuai(State Key Laboratory of Coal and CBM Co-mining,Jincheng 048012,China;Yi’an-Lanyan Coal and CBM Co-mining Technology CO.,Ltd.,Jincheng 048012,China;China University of Petroleum(Beijing),Beijing 102249,China;Henan Polytechnic University,Jiaozuo 454000,China)

机构地区:[1]煤与煤层气共采国家重点实验室,山西晋城048012 [2]易安蓝焰煤与煤层气共采技术有限责任公司,山西晋城048012 [3]中国石油大学(北京),北京102249 [4]河南理工大学,河南焦作454000

出  处:《煤炭科学技术》2022年第12期14-25,共12页Coal Science and Technology

基  金:国家科技重大专项资助项目(2016ZX05045,2016ZX05067);山西省科技重大专项资助项目(20191102001)。

摘  要:为了更好地实现高瓦斯矿区煤炭与煤层气2种资源的安全高效协调开发,在“十一五”“十二五”研发的煤层气“三区联动”立体抽采模式基础上,依托“十三五”国家科技重大专项持续攻关,并紧密结合山西重点煤矿区生产实际,创新研发了全矿区、全层位、全时段的煤矿区煤层气“四区(规划区、准备区、生产区、采空区)联动”井上下联合抽采模式(新晋城模式)和系列技术体系,在山西重点煤矿区得到广泛应用并取得了良好效果。煤矿规划区煤层气地面抽采技术早期主要采用垂直井、定向井、水平井等技术,现已发展至以分段压裂水平井为主导的井工厂化集约开发模式与技术。经十五年的地面超前预抽,晋能控股寺河矿东五盘区3号煤层平均降幅超过55%,该盘区的5310、5311工作面已顺利完成安全高效采煤,实现了高瓦斯煤层的低瓦斯开采。准备区煤层气井上下联合抽采技术充分利用了压裂影响区渗透率大幅提升和井下开放空间抽采生产压差增大的优势,构建了立体抽采网络,提高了煤层气抽采效率,有效缓解了矿井抽掘采接替紧张,促进了高产高效。基于生产区采动活动剧烈和井下工程全开放特点,运用定向钻机精准完成区域递进式顺层钻孔、穿层钻孔、高位定向长钻孔等,精准均衡抽采生产区煤层气,有效解决了常规钻孔轨迹不可控、易形成抽采盲区、抽采效果差等难题,实现了生产区井下抽采精准达标,确保万无一失。针对煤炭采空区煤层气资源赋存规律不清、资源量评估困难、安全钻采技术缺乏等难题,创建了采空区煤层气资源量计算方法,研发了煤矿采空区地面钻采系列技术,已在晋城、西山、阳泉等山西重点煤矿区完成了129口井的示范推广,累计抽采利用煤层气1.28亿m^(3),相当于减排二氧化碳192万t。“四区联动”井上下联合抽采模式和系列技术体In order to better realize the safe and efficient coordinated development of coal and CBM resources in high gassy mining areas,the four regions(planning region, preparation region, production region and coal mined-out region) linkage ground-underground combined drainage mode(new Jincheng mode) and a series of technical systems of CBM in the whole mining area, all stratum layer and all time were innovatively developed. Relying on the “Thirteen Five-Year Plan” national major science and technology projects to continue to tackle key problems, closely combining with the actual production of key coal mining areas in Shanxi Province. This new mode upgraded from the “three regions linkage” three-dimensional extraction mode of CBM developed during the “Eleventh Five-Year” and the“Twelfth Five-Year” Plan and it had been widely used in key coal mining areas of Shanxi Province and achieved good results. The ground pre-drainage technology of CBM in the planning area mainly used vertical wells, directional wells, horizontal wells and other technologies in the early stage. But now it had developed into a well factory intensive development mode and technology dominated by multi-fractured horizontal well. After 15 years of ground pre-drainage, the average reduction of No.3 coal seam in East Fifth Panel of Sihe Mine of Jinneng Holding Group had reached 55%. The No.5310 and No.5311 working faces in this panel had successfully completed safe and efficient coal mining, realizing low gas mining in high gas content coal seam. The ground-underground combined drainage technology of CBM in the preparation region made full use of the advantages of the greatly increased permeability in the fracturing affected area and the increased production pressure difference of underground open space drainage. Which formed a three-dimensional drainage network, improved the drainage efficiency, effectively alleviated the tension in the replacement of mining, and promoted high production and efficiency.Based on the characteristics of inte

关 键 词:煤矿区 煤层气 四区联动 规划区 准备区 生产区 采空区 

分 类 号:P618[天文地球—矿床学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象