检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张宗团 Zhang Zong-tuan(China Railway Urban Construction Group Corporation Limited,Changsha 410000,Hunan Province,China)
出 处:《建筑与装饰》2023年第1期195-198,共4页Construction & Decoration
摘 要:在城市高层建筑密集化建设的今天,原设计建设的市政供水管网压力与用户水压要求间产生了较大矛盾,尤其在市政供水管网末端,此情况尤为严重,相对于调高市政供水管网压力或新建供水管网,在建筑内或小区内增设建筑给水二次加压设备的方案,是既经济且安全的选择.通过对传统二次供水方案使用条件对比分析,结合项目实施中出现的质量事故,从建筑给水二次增压方案的选择、安装前土建工程施工、设备安装及调试等方面来解决建筑二次供水增压有关问题,提高二次供水质量.Now,the high-rise buildings are constructed intensively in the city,the originally designed and constructed municipal water supply pipe network pressure greatly conflicts with the use’s requirement of the water pressure,and such situation is particularly serious in the end of the municipal water supply pipe network.Compared with the elevation of municipal water supply pipe network pressure or construction of new water supply pipe network,it is an economical and safe choice to add secondary pressurizing equipment for building water supply in the building or community.Through the comparison and analysis of the use conditions of the traditional secondary water supply scheme,combined with the quality accidents in the implementation of the project,the problems related to the secondary water supply pressurization of the building are solved from selection of secondary pressurization scheme for building water supply,civil engineering construction before installation,equipment installation and debugging,so as to improve the quality of the secondary water supply.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.150.251