白鹤滩右岸水轮发电机定子铁心装配新技术  被引量:1

New Assembly Technology of Hydro-generator Stator Core for Baihetan Right Bank Project

在线阅读下载全文

作  者:王新洪[1] 周峰[1] 杨年浩 WANG Xinhong;ZHOU Feng;YANG Nianhao(Harbin Electric Machinery Company Limited,Harbin 150040,China;China Three Gorges Construction Engineering Corporation,Chengdu 610095,China)

机构地区:[1]哈尔滨电机厂有限责任公司,哈尔滨150040 [2]中国三峡建工(集团)有限公司,成都610095

出  处:《机械工程师》2023年第1期95-96,100,共3页Mechanical Engineer

摘  要:白鹤滩水电站安装16台全球单机容量最大的1000 MW水轮发电机组,同时也是目前制造安装标准要求极高的机组。针对全新的高精度安装要求,对定子铁心装配工艺进行技术创新优化,为打造精品机组提供技术支撑及有力保障。Baihetan Hydropower Station is equipped with 16 turbine generator units with the largest single unit capacity of1000 MW in the world,which are also the units with the extreme high requirements for manufacturing and installation standards.According to the new high-precision installation requirements,assembly technology of the stator core is innovated and optimized to provide technical support and strong guarantee for building high-quality units.

关 键 词:白鹤滩水电站 单机容量 定子铁心装配 定子铁心装配工艺技术 

分 类 号:TM312.033[电气工程—电机]

 