井塔工程钢框架木胶板模板施工技术探讨  被引量:1

Discussion on Construction Technology of Steel Frame Wood Plywood Formwork for Well Tower Project

在线阅读下载全文

作  者:王芳波 WANG Fang-bo(Mechanical and Electrical Installation Engineering Department of China Coal First Construction Co.,Ltd.,Handan 056002,China)

机构地区:[1]中煤第一建设有限公司机电安装工程处,邯郸056002

出  处:《价值工程》2023年第1期74-76,共3页Value Engineering

摘  要:目前,井塔模式的提升系统工程被越来越多煤矿采纳,井塔工程作为提升系统安装的主要先前部分,井塔施工的工期及质量要求优为重要,采用什么模式的施工工艺才能更好更快的完成井塔工程交付给安装施工,是每个项目考虑的重重之重。At present,more and more coal mines have adopted the hoisting system engineering of the shaft tower model.As the main part of the hoisting system installation,the construction period and quality requirements of the shaft tower construction are very important.What kind of construction technology can be used to better and faster complete the shaft tower project and deliver it to the installation construction is a heavy consideration for each project.

关 键 词:煤矿井塔 剪力墙 钢框木胶板 施工工艺 

分 类 号:TU398.2[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象