垃圾焚烧电厂锅炉优化设计措施  被引量:1

Optimization Design Measures for Boiler of Waste Incineration Power Plant

在线阅读下载全文

作  者:邱留良 QIU Liu-liang(Guangzhou Huantou Yongxing Group Co.,Ltd.,Guangzhou 510475,China)

机构地区:[1]广州环投永兴集团股份有限公司,广州510475

出  处:《应用能源技术》2022年第12期27-30,共4页Applied Energy Technology

摘  要:近年来垃圾焚烧发电在我国有了很大发展,锅炉是垃圾焚烧发电过程中最关键的设备,锅炉受热面腐蚀、堵灰结焦、磨损减薄、爆管泄露防治,锅炉热效率提高及长周期稳定运行是锅炉设计需重点考虑的问题,以便确保垃圾焚烧发电厂安全、经济、稳定运行。In recent years,garbage incineration power generation has been greatly developed in China.Boilers are the most critical equipment in the process of garbage incineration power generation.Corrosion of boiler heating surfaces,ash blockage and coking,wear and thinning,prevention of tube explosion and leakage,improvement of boiler thermal efficiency and long-term stable operation are key issues to be considered in boiler design,so as to ensure safe,economic and stable operation of garbage incineration power plants.

关 键 词:垃圾焚烧电厂 锅炉 优化设计 

分 类 号:TK222[动力工程及工程热物理—动力机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象