五里堠煤矿运输下山掘进破碎顶板防治水设计  

Water Control Design of Broken Roof in Transportation Downhill Driving of Wulihou Coal Mine

在线阅读下载全文

作  者:毛振国 MAO Zhenguo(Wulihou Coal Industry Co.,Ltd.of Zuoquan,Shanxi Lu'an Group,Zuoquan 032600,Shanxi,China)

机构地区:[1]山西潞安集团左权五里堠煤业有限公司,山西左权032600

出  处:《能源与节能》2022年第12期204-206,212,共4页Energy and Energy Conservation

摘  要:五里堠煤矿运输下山在掘进时巷道坡度由15°变为18°。根据水文地质资料情况,巷道的反向掘进段会穿过顶板破碎区且破碎区上方有含水层。为了保证生产安全,需要对顶板破碎段进行加固进而防治水。结合实际情况,采取了顶板管控注浆措施,并对施工参数进行了设计。现场结果表明,采取的注浆措施有效,可以有效地防治水。The roadway slope of Wulihou Coal Mine was changed from 15° to 18° during the transportation downhill driving.According to the hydrogeological data, the reverse tunneling section of the roadway will pass through the roof crushing area and there is an aquifer above the crushing area. In order to ensure safe production, it is necessary to reinforce the broken roof section to prevent and control water. Combined with the actual situation, the roof control grouting measures were adopted, and the construction parameters were designed. The field results show that the grouting measures adopted are effective and can effectively prevent and control water.

关 键 词:煤矿运输下山 巷道 顶板破碎 防治水 

分 类 号:TD745[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象