大兴煤矿303工作面超前支护技术研究  被引量:2

Research on Advance Support Technology of the 303 Working Face in Daxing Coal Mine

在线阅读下载全文

作  者:马菲菲 Ma Feifei(Zaozhuang Daxing Mining Industry Co.,Ltd.,Shandong Zaozhuang 277319)

机构地区:[1]枣庄大兴矿业有限责任公司,山东枣庄277319

出  处:《山东煤炭科技》2022年第12期68-71,共4页Shandong Coal Science and Technology

摘  要:大兴煤矿303工作面超前段原单体支柱支护工作量大,且不能满足软岩巷道的支护要求,提出采用注浆锚索代替单体支柱作为超前支护方式,建立了超前支护数值计算模型,并通过现场监测对围岩变形效果、围岩裂隙发育进行了验证。数值模拟结果与现场矿压观测结果表明,巷道顶底板、两帮变形量、塑性区范围及围岩裂隙发育程度均有所减小。The workload of supporting the original single pillar in the leading section of the 303 working face in Daxing Coal Mine is heavy, and it can not meet the support requirements of soft rock roadway. It is proposed to use grouting anchor cable instead of single pillar as the advance support mode, and the numerical calculation model of advance support is established. The surrounding rock deformation effect and the development of surrounding rock cracks are verified by on-site monitoring. The results of numerical simulation and in-situ mine pressure observation show that the roof and floor of the roadway, the deformation of the two sides, the range of plastic zone and the development degree of cracks in surrounding rock are all reduced.

关 键 词:超前支护 注浆锚索 软岩 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象