作 者:赵金秀 ZHAO Jin-xiu(The Third Engineering Co.,Ltd.of China Railway 17th Bureau Group,Shijiazhuang 050081,China)
机构地区:[1]中铁十七局集团第三工程有限公司,石家庄050081
出 处:《价值工程》2023年第2期38-40,共3页Value Engineering
摘 要:预应力混凝土连续梁,在近几年铁路建设中越来越多。预应力混凝土连续梁跨越既有线路(铁路、公路、航道等),因此预应力混凝土连续梁施工备受关注,在安全、质量、进度(涉及到大吨位预应力混凝土预制梁的铺架)各个方面都是卡控重点,同时因为备受关注,施工单位工期压力与资金压力很大。本文是在安全与质量的前提下,积极探索新方法,缩短工期,降低成本。影响预应力混凝土连续梁施工的因素很多,本文选取0#块预压为研究点。Prestressed concrete continuous beams have become more and more popular in railway construction in recent years.The prestressed concrete continuous beam spans the existing lines(railways,highways,waterways,etc.),so the construction of prestressed concrete continuous beam has attracted much attention.It is the key point of control in all aspects of safety,quality,and progress(involving the laying of large tonnage prestressed concrete precast beams).At the same time,because of the great attention,the construction unit has great pressure on construction period and funds.Under the premise of safety and quality,this paper actively explores new methods to shorten the construction period and reduce costs.There are many factors that affect the construction of prestressed concrete continuous beams.In this paper,0#block preloading is selected as the research point.
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.224