检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘文凯 张雄天 张军奎 冯红刚 LIU Wen-kai;ZHANG Xiong-tian;ZHANG Jun-kui;FENG Hong-gang(Lanzhou Engineering&Research Institute Of Nonferrous Metallurgy Co,Ltd,Lanzhou 730000,China)
机构地区:[1]兰州有色冶金设计研究院有限公司,甘肃兰州730000
出 处:《世界有色金属》2022年第20期128-130,共3页World Nonferrous Metals
摘 要:某大型复杂金矿床,矿体条数达333条,矿山设计阶段需进行中段资源量计算,若采用传统体积分配法,则极其困难,利用micromine矿业软件建立该矿三维地质模型,采用距离平方反比法估算矿体资源量,可快速实现中段资源量估算,大大提高设计效率。There are 333 ore bodies in a large and complex gold deposit. The middle section resource calculation is required in the mine design stage. If the traditional volume allocation method is used, it is extremely difficult. The three-dimensional geological model of the mine is established by using the mining software micromine. The inverse distance square method is used to estimate the ore body resource, which can quickly realize the middle section resource estimation and greatly improve the design efficiency.
关 键 词:micromine软件 矿体三维模型 中段资源量估算
分 类 号:TD852[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7