湿陷性黄土地质下穿既有铁路顶推箱涵施工技术  被引量:2

The construction technology of pushing box culvert passing through beneath the existing railway at the condition of collapsible loess

在线阅读下载全文

作  者:王勤富 WANG Qin-fu(CCCC CENTRAL-SOUTH ENGINEERING COMPANY,Ltd.,Changsha 410000,China)

机构地区:[1]中交中南工程局有限公司,湖南长沙410000

出  处:《四川建材》2023年第1期115-117,140,共4页Sichuan Building Materials

摘  要:依托河北省太行山高速公路京蔚段与沙蔚铁路的相交工程,对湿陷性黄土地质状况下穿越既有铁路的顶推箱涵施工技术要点进行介绍。通过一系列保证措施以及严密的监控量测技术确保施工过程中铁路的正常运行,为今后相似地质状况下顶推箱涵施工提供指导。This paper is based on the intersecting project of the Jing Yu section of the Taihang Mountain Expressway in Hebei province and the Sha Yu railway. It mainly introduces the construction techniques of pushing box culvert in collapsible loess geological conditions through existing railway. A series of guarantee measures and strict monitoring measurement techniques can ensure the normal operation of railway during the construction process. It can provide a reference for the similar geological condition of pushing box culvert in the future.

关 键 词:湿陷性黄土地质 顶推箱涵 监控量测 

分 类 号:TU745.4[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象