检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王国锋 陈雄涛 田军[1] 侯俊耀 毛亚伟 贾瑜 Wang Guofeng;Chen Xiongtao;Tian Jun
机构地区:[1]川庆钻探工程有限公司长庆井下技术作业公司,西安710021
出 处:《机械制造》2022年第11期34-36,共3页Machinery
摘 要:油气井在修井作业时,需要对井控装置及套管头进行试压,验证密封性符合要求。确保井控装置合格是预防井控险情的必要手段。目前现场主要采用手动打压泵+皮碗封隔器的组合试压方法,已不能满足对防喷器全封闸板试压和高压油气井试压的需求。对此,设计了一种可控压水力扩张式试压封隔器,并提出相应的试压方法,可以满足油气井试压的要求,并且保证修井作业井控安全。During the workover operation of oil well and gas well,it is necessary to test the pressure of the well control device and casing head to verify that the tightness meets the requirement.Ensuring that the well control device is qualified is a necessary means to prevent the danger of well control.At present,the combined pressure test method of manual press pump+leather bowl packer is mainly used on site,which can no longer meet the need of pressure test for full-sealing gate of blowout preventer and pressure test of high-pressure oil well and gas well.In this regard,a pressure-controllable hydraulic expanding type pressure test packer was designed,and the corresponding pressure test method was proposed,which can meet the requirement of oil well and gas well pressure test and ensure the safety of well control in workover operation.
分 类 号:TE358[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.39.144