肿瘤大楼低压配电柜改造技术要点  

Key Technical Points of Low‑voltage Distribution Cabinet Reconstruction in Tumor Treatment Building

在线阅读下载全文

作  者:彭松龙 齐振胜 苏姗 PENG Songlong;QI Zhensheng;SU Shan(General Hospital of the Chinese People's Liberation Army,Beijing 100039,China)

机构地区:[1]中国人民解放军总医院,北京市100039 [2]中国人民解放军总医院营房处,北京市100039

出  处:《建筑电气》2023年第1期64-67,共4页Building Electricity

摘  要:通过前期对肿瘤大楼变配电室现场勘查及其运行数据的统计、分析,找到为新增用电负荷送电的最快捷解决方案。对改造过程中的突发问题采取及时、有效的解决措施。对施工全过程进行详细记录,并作出多维度的总结和分析。Through the statistics and analysis of the on‑site survey and operation data of the power transformation and distribution room of the Tumor Treatment Building in the early stage,the paper finds the quickest solution to power supply for new electrical load.In the paper,it is stated that timely and effective measures should be taken to solve the unexpected problems in the transformation process,and that the whole construction process should be recorded in detail,and multi‑dimensional summary and analysis be made.

关 键 词:肿瘤大楼 低压配电系统 变配电室 低压出线柜 变压器 负荷率 断路器 改造 

分 类 号:TU852[建筑科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象