检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:毛章伟 李德文 谢朔 MAO Zhangwei;LI Dewen;XIE Shuo(Shanghai Construction No.5(Group)Co.,Ltd.,Shanghai 200063,China;Huadong Hospital,Shanghai 200040,China)
机构地区:[1]上海建工五建集团有限公司,上海200063 [2]华东医院,上海200040
出 处:《建筑施工》2022年第12期2819-2821,共3页Building Construction
摘 要:以上海市文物保护建筑华东医院南楼的整体修缮工程为例,介绍了建筑顶升技术及增设隔震支座的施工方法。通过对施工中重难点分析、顶升前施工准备、顶升施工以及隔震支座施工等几个阶段的关键施工技术介绍,总结出了建筑整体顶升受力托换的施工方法,对今后文物保护建筑的顶升受力托换有一定参考价值,同时对相关工程施工提供了类似经验。Taking the overall restoration project of the South Building of Huadong Hospital, a heritage preservation building in Shanghai, as an example, the construction method of building jacking technology and additional seismic isolation bearing is introduced. Through the analysis of the important and difficult points in the construction, the construction preparation before jacking, the jacking construction and the construction of seismic isolation bearing and other key construction techniques, the construction method of the overall jacking force replacement of the building is summarized. It has a certain reference value for the future jacking force replacement of heritage preservation buildings and provides similar experience for the construction of related projects.
分 类 号:TU746[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.10