大直径斜桩超重超大钢筋笼制作安装关键技术  被引量:2

Key Technologies for Fabrication and Installation of Super Large and Super Heavy Reinforcement Cage for Large Diameter Battered Pile

在线阅读下载全文

作  者:许谷星 周伏萍 XU Guxing;ZHOU Fuping(Jiangxi Geological Engineering(Group)Company,Nanchang,Jiangxi 330029,China)

机构地区:[1]江西省地质工程(集团)公司,江西南昌330029

出  处:《建筑施工》2022年第12期2882-2884,共3页Building Construction

摘  要:在港口码头工程的大直径钻孔灌注桩斜桩工程施工时,针对钢筋笼制作、运输与安装难题,提出了钢筋笼制作、运输、孔口连接、斜度控制等相关装置,并介绍了技术控制要点。项目采取所述装置和措施后有效地保证了钢筋笼施工质量,对类似工程具有一定的借鉴价值。In the construction of large diameter bored pile battered pile in port and wharf engineering, in view of the difficulties in the fabrication, transportation and installation of reinforcement cage, the relevant devices for the fabrication,transportation, orifice connection, slope control, etc. of reinforcement cage are put forward, and the key points of technical control are introduced. The devices and measures effectively guarantee the construction quality of the reinforcement cage, which is of certain reference value to similar projects.

关 键 词:斜桩 大直径钢筋笼 超重 制作安装 

分 类 号:TU753[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象