检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨凯 蒋博洋 张友杰[1] 郭志鑫[1] 周军帅 田大卫 YANG Kai;JIANG Boyang;ZHANG Youjie;GUO Zhixin;ZHOU Junshuai;TIAN Dawei(General Contractor of China Construction Eighth Engineering Division Co.,Ltd.,Shanghai 201204,China)
机构地区:[1]中国建筑第八工程局有限公司总承包公司,上海201204
出 处:《建筑施工》2022年第12期2904-2907,2922,共5页Building Construction
摘 要:为解决大跨度半球形钢筋混凝土穹顶结构的高支模施工难题,采用BIM建模确定支撑系统中每根立杆的位置和长度,通过现场放样和定型钢管的煨弯加工搭设安装模板支撑系统,覆以柔性木胶合板加方木以及分段施工设置钢板止水带,很好地确保了大跨度半球形钢筋混凝土结构穹顶的施工质量。总结的经验可为今后类似工程施工参考。To solve the difficult problem of high formwork construction of large-span hemispherical reinforced concrete dome structure,BIM modeling is used to determine the position and length of each pole in the support system.The formwork support system is erected and installed through onsite setting out and the bending processing of shaped steel pipes by covering flexible wood plywood with wood squares and installing steel plate water stop in section construction.The construction quality of large-span hemispherical reinforced concrete dome structure is well ensured.The summarized experience can be used as a reference for similar projects in the future.
分 类 号:TU755[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222